Durable BS1139 Scaffolding Pipe for Construction Projects and Safety

Product Details
Customization: Available
After-sales Service: 24 Hours Full Time Service
Warranty: One Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 10 foreign trading staff(s) and 10 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (26)
  • Durable BS1139 Scaffolding Pipe for Construction Projects and Safety
  • Durable BS1139 Scaffolding Pipe for Construction Projects and Safety
  • Durable BS1139 Scaffolding Pipe for Construction Projects and Safety
  • Durable BS1139 Scaffolding Pipe for Construction Projects and Safety
  • Durable BS1139 Scaffolding Pipe for Construction Projects and Safety
  • Durable BS1139 Scaffolding Pipe for Construction Projects and Safety
Find Similar Products

Basic Info.

Type
Fixed
Supporting Mode
Projecting Scaffolding
Erection Position
External Scaffolding
Construction Properties
Building Scaffold
Transport Package
by Bundle
Trademark
Wufang
Origin
China
HS Code
7308400000
Production Capacity
10000 Tons/Month

Product Description

Item
Outside and W.T.(mm)
Length(m)
Weight(kg)
scaffolding tube
48.3*3.25
6
21.66
Scaffolding tube
48.3*4.0
6
26.22
Length alos can customized from 1-8M.
Packing: 61pieces or 91pieces as one bundle. Each bundles by 8 steel strips.
We also can offer plastic caps for both ends of tube.


 
Durable BS1139 Scaffolding Pipe for Construction Projects and Safety
Features
♦Material: hot galvanized steel tube
♦Grade: Q235
♦Standard according to BS1139/EN74
♦Certificate: SGS/ISO/BV/CE/CQC
♦OEM accepted.
♦Guarantee for 20years. 9years production history
♦MOQ:25 metric tons.
♦Delivery time: 25-30days.
♦Package: by bundle/by piece suitable for sea transportation
♦Sample is available.
 
Advantage
Scaffolding pipe can be jointed together at any angle with the right coupler. They are wonderful succedaneum of standard scaffoldings and steel props.
♦ Scaffolding pipe are widely used in construction and real estate which are much cheaper and convenient.
♦ Scaffolding pipe are multi-functional; they can be cut at any length as the customers' requirement.
♦ Scaffolding pipe match with couplers are good choice for outside masonry construction and also proper for inside concrete
support.
Durable BS1139 Scaffolding Pipe for Construction Projects and Safety


 
PRODUCT APPLICATION
 
♦ Scaffolding pipe are widely used in construction and real estate which are much cheaper and convenient.
♦ Scaffolding pipe can be jointed together at any angle with the right coupler. They are wonderful succedaneum of standard scaffoldings and steel props.
 
Durable BS1139 Scaffolding Pipe for Construction Projects and Safety
Durable BS1139 Scaffolding Pipe for Construction Projects and Safety


 
ABOUT WUFANG
 
  Tangshan Wufang Industry Co., Ltd is located in the steel center-Tangshan, enjoying convenient transportation and beautiful environment. Our company covers an area of 50000 square meters and has more than 500 employees. We are specialized in design, producing and sale of ringlock system scaffolding, frame system scaffolding, adjustable steel props, walking board, ladders, tubes and couplers, etc. Besides, we are making great efforts to develop new products to meet different requirements. We have QC equipment to strictly control the product quality. Adhering to the business principle of mutual benefits, we have had a reliable reputation among our customers because of our professional services, quality products and competitive prices. We warmly welcome domestic and oversea friends to cooperate with us for common success.

Durable BS1139 Scaffolding Pipe for Construction Projects and Safety


 
FAQ
 
1.Q: Are you factory or trader?
A: We are factory, manufacturer more than ten years.

2.Q: How about your delivery time?
A: About 10 to 20 days after deposit.

3.Q: How about your payment mode and sample?
A: Normally by T/T and L/C, it's negotiable

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier