Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building

Product Details
Customization: Available
Material: Steel
Structural Style: Multi-Pole Scaffolding
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 10 foreign trading staff(s) and 10 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (26)
  • Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building
  • Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building
  • Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building
  • Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building
  • Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building
  • Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building
Find Similar Products
  • Overview
  • Product Description
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Framework
Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
Full Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Building Scaffold
Steel Grade
Q195, Q235
Surface
Pre-Galvanized, Powder Coated
Frame Type
Main Frame, H Frame, Walk Thru Frame, etc
Cross Brace
21.3X1.4X2198mm/1928mm/1363mm
Joint Pin
36X1.5X225mm/210mm
Compoents
Catwalk, Staircase, Base Jack, Castor, etc
MOQ
500PCS
Transport Package
in Bundle or in Bulk
Specification
1219x1700mm, 1219x1930mm, etc
Trademark
WUFANG
Origin
China
HS Code
73084000
Production Capacity
1000 Pieces/Day

Product Description

Product Description

Frame scaffolding is also called tubular steel frame scaffolding, door style frame scaffolding, is a long established modular frame scaffolding system serving as working platform for construction and decoration purposes, which is composed of main frames, catwalk or walk board, braces or cross braces, brackets, coupling pins of spigot, guardrails and sometimes casters, etc.
Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building Item A (Width) B (Height)
Main Frame

Outer tube: 42*2.2mm/2.0mm/1.8mm

Inner tube: 25*1.5mm/1.8mm/2.0mm
1219mm 1524mm
1219mm 1700mm
1219mm 1930mm
914mm 1524mm
914mm 1700mm
914mm 1930mm
Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building Item A (Width) B (Height)
H Frame

Outer tube: 42*2.2mm/2.0mm/1.8mm

Inner tube: 25*1.5mm/1.8mm/2.0mm
1219mm 914mm
1219mm 1219mm
1219mm 1524mm
1219mm 1700mm
1219mm 1930mm
914mm 914mm
914mm 1219mm
914mm 1524mm
914mm 1700mm
914mm 1930mm
 
Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building Item A (width) B (height) C (length)
Cross Brace

21.3*1.0mm/1.2mm/1.4mm
1829mm 1219mm 2198mm
1219mm 1219mm 1724mm
1829mm 914mm 2045mm
1829mm 610mm 1928mm
1219mm 610mm 1363mm
Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building Item Size
Joint Pin 36*1.5*225mm
36*1.2*225mm
36*1.0*225mm
 
Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building

Packaging & Shipping

Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building

Company Profile

Tangshan Wufang Industry Co., Ltd, with an investment of U.S. Dollars of 8 million, is a professional manufacturer engaged in the design, production & sale of scaffolding systems.

1. Location: Tangshan Wufang is leading scaffolding manufacturer, located in Tangshan, Hebei Province, the raw material basement.
2. Team: We have professional team for sale, project design and construction.
3. Main products: Ringlock Scaffolding, Frame Scaffolding, Steel Plank, Catwalk, Ladders, Pipe & Clamp, Steel Prop, etc.
4. Production capacity: 7000-10000 Tons/month.
5. Loading capacity: 8-12 containers/day.
6. Delivery time: 10-15 days for 3-5 containers.
Fast delivery to satisfy your urgent project demand.
Walk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office BuildingWalk Through Ladder Steel Scaffolding Frame Scaffold 3FT 4FT 5.5FT Office Building

FAQ

Q1: Are you a factory or trading company?    
A: We are a factory specializing in manufacturing scaffolding material.
Q2: Where is the loading port?
A: Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, SGS certification.
Q5: Can I get some samples?    
A: Yes,  but usually the customer will pay for the cost and freight charges. 
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier