Customization: | Available |
---|---|
Warranty: | 1 Year |
Material: | Steel |
Still deciding? Get samples of US$ 20/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Scaffolding Adjustable Base Jack & U-head Jack | ||||
Base Jack Type | Screw Jack | Base Plate | ||
Solid Base Jack | 30*400 / 500 / 600mm | 120*120*4mm | ||
32*400 / 500 / 600mm | 120*120*4mm | |||
34*400 / 500 / 600mm | 140*140*5mm | |||
Hollow Base Jack | 38*5*500 / 600mm | 150*150*6mm | ||
48*5*500 / 600mm | 150*150*6mm | |||
Solid U-head Jack | 30*400 / 500 / 600mm | 150*120*50*5mm | ||
32*400 / 500 / 600mm | 150*120*50*5mm | |||
34*400 / 500 / 600mm | 150*120*50*5mm | |||
Hollow U-head Jack | 38*5*500 / 600mm | 170*130*50*5mm | ||
38*5*500 / 600mm | 185*150*50*6mm | |||
48*5*500 / 600mm | 170*130*50*5mm | |||
48*5*500 / 600mm | 185*150*50*6mm |
1. Location: Tangshan Wufang is leading scaffolding manufacturer, located in Tangshan, Hebei Province, the raw material basement.
2. Team: We have professional team for sale, project design and construction.
3. Main products: Ringlock Scaffolding, Frame Scaffolding, Steel Plank, Catwalk, Ladders, Pipe & Clamp, Steel Prop, etc.
4. Production capacity: 7000-10000 Tons/month.
5. Loading capacity: 8-12 containers/day.
6. Delivery time: 10-15 days for 3-5 containers.
Fast delivery to satisfy your urgent project demand.
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing scaffolding material.
Q2: Where is the loading port?
A: Tianjin(Xingang) Port.
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one Container is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, SGS certification.
Q5: Can I get some samples?
A: Yes, but usually the customer will pay for the cost and freight charges.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 15-30 days, according to different quantity requirement