Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler

Product Details
Customization: Available
Material: Steel
Type: Fixed
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 10 foreign trading staff(s) and 10 staff(s) with over 6 years of overseas trading experience
Self-branded
The supplier has 2 Self-brands, check the Audit Report for more information
to see all verified strength labels (26)
  • Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler
  • Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler
  • Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler
  • Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler
  • Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler
  • Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler
Find Similar Products

Basic Info.

Supporting Mode
Projecting Scaffolding
Erection Position
External Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Transport Package
Wooden Pallet, Steel Pallet
Trademark
Wufang
Origin
China
HS Code
7308400000
Production Capacity
40000 Pieces/Day

Product Description

1. Pressed scaffolding clamp
Item
Product Name
Type
Thickness
Outer Diameter
U.W
PC of 20`GP
1
Double Coupler
Pressed
4.75mm
48.3mm
0.82kg
25000
2
Swivel Coupler
Pressed
4.5*4.75mm
48.3mm
0.99
23500
3
Sleeve Coupler
Pressed
3.5mm
48.3mm
1.0kg
20736
4
Inner Joint Pin
Pressed
4.5mm
48.3mm
0.7kg
35000
5
Half Coupler
Pressed
4.75mm
48.3mm
0.45
49000
6
Board Retaining
Pressed
4.75mm
48.3mm
0.56kg
35000
7
Putlog Coupler
Pressed
4.75mm
48.3mm
0.57kg
35000
2. Drop forged scaffolding clamp
Item
Product Name
Type
Thickness
Outer Diameter
U.W
PC of 20'GP
1
Double Coupler
Drop Forged
 
48.3mm
1.0-0.98kg
24000
2
Swivel Coupler
Drop Forged
 
48.3mm
1.12kg
21000
3
Sleeve Coupler
Drop Forged
3.5mm
48.3mm
0.98--1.0kg
21000
4
Inner Joint Pin
Drop Forged
 
48.3mm
1.05kg
24000
5
Board Retaining
Drop Forged
4.75mm
48.3mm
0.61kg
35000
6
Girder Coupler
Drop Forged
11.5mm
48.3mm
1.52
15000
7
Putlog Coupler
Drop Forged
4.75mm
48.3mm
0.61kg
35000

 
Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler
Features
♦Material: Q235
Size:48.3*48.3mm,48.3*60.3mm
Surface finish: electro galvanized
♦Standard: BS1139, EN74
♦Types: british swivel coupler, british fixed coupler, board retaining coupler, putlog coupler, sleeve coupler, inner joint pin, 110° double coupler, 110° swivel coupler, 90° swivel coupler, 90° double coupler
Advantage
 
♦ The tube and coupler scaffolding system is the best solution for construction or maintenance works.
♦ Economic convenience
♦ Safety and quality
Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler


 
PRODUCT APPLICATION
 
♦ Scaffolding coupler is used to assemble tube-and coupler scaffolding system.
♦ Restoration of buildings.
♦ Maintenance of particularly complex or extremely deteriorated architectural works.

 
Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler
Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler


 
ABOUT WUFANG
 
  Tangshan Wufang Industry Co., Ltd is located in the steel center-Tangshan, enjoying convenient transportation and beautiful environment. Our company covers an area of 50000 square meters and has more than 500 employees. We are specialized in design, producing and sale of ringlock system scaffolding, frame system scaffolding, adjustable steel props, walking board, ladders, tubes and couplers, etc. Besides, we are making great efforts to develop new products to meet different requirements. We have QC equipment to strictly control the product quality. Adhering to the business principle of mutual benefits, we have had a reliable reputation among our customers because of our professional services, quality products and competitive prices. We warmly welcome domestic and oversea friends to cooperate with us for common success.

Scaffolding Pipe Swivel Clamp Load Capacity Double Coupler


 
FAQ
 
1.Q: Are you factory or trader?
A: We are factory, manufacturer more than ten years.

2.Q: How about your delivery time?
A: About 10 to 20 days after deposit.

3.Q: How about your payment mode and sample?
A: Normally by T/T and L/C, it's negotiable

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier